ICode9

精准搜索请尝试: 精确搜索
首页 > 其他分享> 文章详细

PSTAT 174/274

2020-03-08 18:52:37  阅读:310  来源: 互联网

标签:series should project PSTAT 274 model 174 data your



PSTAT 174/274 COURSE PROJECT
The course project is an opportunity for students to apply time series techniques to real-world problems. Data and
software for the project can be obtained from various Internet sites, or developed by students.
You are encouraged to collaborate on this project with the rest of the class - feel free to discuss your ideas with
other students. The “deliverables”, however, should be unique to you. Your project will be graded on its merits;
plagiarism will result in a score of 0.
Deliverables and deadlines. There will be two “deliverables” on this project.
Project report is due on March 13th, 2020. The
subject line of your e-mail must start with your first and last name, e.g., PSTAT 274 final project
submission. Please use the following format for the name of the file, e.g., Raya Feldman-174 final project.pdf .
Project defense is required in addition to a written report. It should take place during finals week or before;
scheduling of the defense is your responsibility. Please prepare a 5-minutes summary of your findings.
Project Report. The project report should contain the following:
1. Abstract or Executive summary should be one–two short paragraphs summarizing briefly the questions you addressed,
your time series techniques, key results, and conclusions.
2. The main body of the report should cover the following:
Introduction. Restate your problem, including details. Describe the data set and explain why this data set is
interesting or important. Provide a clear description of the problem you plan to address using this dataset (for
example to forecast) and include techniques you use. Describe results (positive and negative) and briefly state your
conclusions. Please acknowledge the source of your data and software used.
Sections.
• Plot and analyze the time series. Examine the main features of the graph, checking, in particular, whether
代写PSTAT 174/274作业、代做Data课程作业
there is (i) a trend; (ii) a seasonal component, (iii) any apparent sharp changes in behavior. Explain in detail.
• Use any necessary transformations to get a stationary series. Give a detailed explanation to justify your choice
of a particular procedure. If you have used transformation, justify why. If you have used differencing, what lag
did you use? Why? Is your series stationary now?
• Plot and analyze ACF and PACF to preliminary identify your model(s). Explain your choices of suitable p
and q here.
• Fit your model(s): Estimate the coefficients and perform diagnostic checking. Compare at least two models
to choose the final model and explain how you decided on your “best” model. Is the model obtained by using
AIC(C) the same as one of the models suggested by ACF/PACF? Write the fitted model in algebraic form. Do
you conclude from the analysis of residuals that your model is satisfactory?
• Do forecasting. Make sure to include confidence intervals. Make sure to return to original data. Plot the
original series and the forecasts.
• Only for PSTAT 274 students: Perform spectral analysis of your model.
3. Conclusion Section. Reiterate your conclusions referring to the goals of your project. Were these goals achieved?
Record the math formula for the model you chose. Acknowledge all individuals who helped you with this project.
4. References.
5. Appendix. Include your code with comments.
Report should not be long; please do not add words for the sake of being wordy. The report must be self-contained,
i.e. if you use formulas, write them. Include all necessary plots either in the body of the report or in appendix.
When including R outputs, analyze the outputs and explain what you plan to do next, why and how.
Time Series Data Libraries:
Please see a separate document with suggested websites for time series data.
Please acknowledge the source of your data in the project. Project diagram – see page 2.
GOOD LUCK !!!
March 3
Model building
DATA
Postulate class of models
Identify particular model
(X1, …, Xn) = (x1, … xn)
Class of models: log/power transforms,
seasonal, non/stationary
Identify p and q for ARMA
using acf/pacf
Estimate model parameters Estimate from data

标签:series,should,project,PSTAT,274,model,174,data,your
来源: https://www.cnblogs.com/welcomeyou/p/12444148.html

本站声明: 1. iCode9 技术分享网(下文简称本站)提供的所有内容,仅供技术学习、探讨和分享;
2. 关于本站的所有留言、评论、转载及引用,纯属内容发起人的个人观点,与本站观点和立场无关;
3. 关于本站的所有言论和文字,纯属内容发起人的个人观点,与本站观点和立场无关;
4. 本站文章均是网友提供,不完全保证技术分享内容的完整性、准确性、时效性、风险性和版权归属;如您发现该文章侵犯了您的权益,可联系我们第一时间进行删除;
5. 本站为非盈利性的个人网站,所有内容不会用来进行牟利,也不会利用任何形式的广告来间接获益,纯粹是为了广大技术爱好者提供技术内容和技术思想的分享性交流网站。

专注分享技术,共同学习,共同进步。侵权联系[81616952@qq.com]

Copyright (C)ICode9.com, All Rights Reserved.

ICode9版权所有